Throttle Body: Installation: Installation
- INSTALL THROTTLE BODY ASSEMBLY
- Install the 2 water by-pass hoses to the throttle body.
- Install a new gasket to the intake air surge tank.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
HINT:
Align the protrusion of the gasket with the groove of the intake air surge tank.
- Install the throttle body with the 4 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the throttle position sensor and control motor connector.
- Connect the 2 water by-pass hoses.
- ADD ENGINE COOLANT . Refer to REPLACEMENT - Step 5
- INSTALL AIR CLEANER HOSE ASSEMBLY . Refer to INSTALLATION - Step 10
- INSPECT FOR COOLANT LEAK . Refer to ON-VEHICLE INSPECTION - Step 1
- CHECK THROTTLE BODY ASSEMBLY See step 1
- INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 49
- INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH . Refer to INSTALLATION - Step 13
- INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH . Refer to INSTALLATION - Step 14
- PERFORM INITIALIZATION NOTE:
Perform the following procedure after replacing the ECM, throttle body assembly or any throttle body components. The following procedure should also be performed if the throttle body is cleaned.
- Disconnect the cable from the negative (-) battery terminal. Wait at least 60 seconds and reconnect the cable.
- Turn the ignition switch on (IG) without operating the accelerator pedal.NOTE:
If the accelerator pedal is operated, perform the above steps again.
- Connect the Techstream to the DLC3 and clear the DTCs. Refer to DTC CHECK / CLEAR .
- Start the engine and check that the MIL is not illuminated and that the idle speed is within the specified range when the A/C is switched off after the engine is warmed up.
Standard
Condition Engine Idle Speed A/C switched off 650 to 750 rpm NOTE:- Be sure to perform this step with all accessories off.
- Make sure that the shift lever is in N or P.
- Enter the following menus: Powertrain / Engine and ECT / Data List / Throttle Sensor Volt %. Fully depress the accelerator pedal and check that the value is 60% or more.
- Perform a road test and confirm that there are no abnormalities.
- INSTALL V-BANK COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 46