Inspection Procedure
- CHECK DOOR LOCK OPERATION
- Check door lock operation (See OPERATION CHECK ).
NG: REPLACE DOOR LOCK
OK: GO TO NEXT STEP
- CHECK HARNESS AND CONNECTOR (TVIP ECU - DOOR LOCK)
- Disconnect the TVIP ECU and door lock connector.
- Measure the resistance according to the value(s) in TVIP ECU - DOOR LOCK
.
Standard resistance
TVIP ECU - DOOR LOCKTester Connection Specified Condition L2 (T3-16) - D11-9 Below 1 Ω UL3 (T3-17) - D11-10 Below 1 Ω L2 (T3-16) - D11-9 Below 1 Ω L2 (T3-16) - D12-6 Below 1 Ω UL2 (T3-18) - D12-5 Below 1 Ω
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: GO TO NEXT STEP
- CHECK HARNESS AND CONNECTOR (DOOR LOCK - BODY GROUND)
- Disconnect the door lock connectors.
- Measure the resistance according to the value(s) in DOOR LOCK - BODY GROUND
.
Standard resistance
DOOR LOCK - BODY GROUNDTester Connection Specified Condition D11-7 - Body ground Below 1 Ω D12-8 - Body ground Below 1 Ω
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE TVIP ECU