LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2023 >> Outback Base >> Repair and Diagnosis >> Transmission >> Automatic Trans >> CVT Transaxle System (Tr580) >> Preparation for Overhaul >> Procedure >> After Overhaul

After Overhaul

  1. Remove the ST (STAND ASSY).
  2. Install the air breather hose. Ref. to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>AIR BREATHER HOSE>INSTALLATION .
  3. Install the torque converter. Ref. to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>TORQUE CONVERTER>INSTALLATION .
  4. Remove the filler plug (for overhaul), and refill approx. 10 L (10.6 US qt, 8.8 Imp qt) of CVTF.
    CAUTION: Always use specified CVTF. Using fluid other than specified CVTF will cause malfunction.

    Preparation items: 

    CVTF: Ref. to CONTINUOUSLY VARIABLE TRANSMISSION (TR580)>GENERAL DESCRIPTION>SPECIFICATION>CVTF .

    G13936066Courtesy of SUBARU OF AMERICA, INC.
  5. Using a new gasket, install the filler plug (for overhaul).

    Tightening torque: 

    50 N.m (5.1 kgf-m, 36.9 ft-lb)