PCV Valve: Installation: Installation
- INSTALL VENTILATION VALVE SUB-ASSEMBLY
- Apply adhesive to 2 or 3 threads of the ventilation valve.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Adhesive
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
- Install the ventilation valve.
Torque: 20 N*m ( 204 kgf*cm, 15 in.*lbf)
- Connect the ventilation hose.
- Apply adhesive to 2 or 3 threads of the ventilation valve.
- INSTALL INTAKE MANIFOLD . Refer to INSTALLATION - Step 1
- INSTALL ENGINE OIL LEVEL DIPSTICK
- INSTALL TRANSMISSION OIL LEVEL GAUGE SUB-ASSEMBLY (for Automatic Transaxle) . Refer to INSTALLATION - Step 3
- INSTALL OIL COOLER TUBE (for Automatic Transaxle) . Refer to INSTALLATION - Step 4
- INSTALL STARTER ASSEMBLY . Refer to INSTALLATION - Step 1
- INSTALL INJECTOR VIBRATION INSULATOR . Refer to INSTALLATION - Step 1
- INSTALL NO. 1 DELIVERY PIPE SPACER . Refer to INSTALLATION - Step 3
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY . Refer to INSTALLATION - Step 4
- CONNECT FUEL TUBE SUB-ASSEMBLY . Refer to INSTALLATION - Step 5
- INSTALL FUEL PIPE CLAMP . Refer to INSTALLATION - Step 6
- CONNECT VACUUM HOSE . Refer to INSTALLATION - Step 7
- CONNECT NO. 1 FUEL VAPOR FEED HOSE . Refer to INSTALLATION - Step 8
- INSTALL HARNESS BRACKET . Refer to INSTALLATION - Step 9
- INSTALL ENGINE WIRE HARNESS . Refer to INSTALLATION - Step 10
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE . Refer to INSTALLATION - Step 2
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N*m ( 55 kgf*cm, 48 ft.*lbf)
- ADD ENGINE COOLANT . Refer to REPLACEMENT - Step 2
- INSPECT FOR COOLANT LEAK . Refer to ON-VEHICLE INSPECTION - Step 1
- INSPECT FOR FUEL LEAK
Refer to PRECAUTION
- INSTALL NO. 2 CYLINDER HEAD COVER . Refer to INSTALLATION - Step 3
- INSTALL ENGINE UNDER COVER RH
Torque: 5.0 N*m ( 51 kgf*cm, 44 ft.*lbf)
- INSTALL ENGINE UNDER COVER LH
Torque: 5.0 N*m ( 51 kgf*cm, 44 ft.*lbf)