LEMON Manuals: Even more car manuals for everyone
Home >> Scion >> 2010 >> xD Automatic >> Repair and Diagnosis >> Engine Performance >> Remove, Overhaul & Install >> Emission Control (Service Information) >> PCV Valve >> Installation >> Installation

PCV Valve: Installation: Installation

  1. INSTALL VENTILATION VALVE SUB-ASSEMBLY 
    1. Apply adhesive to 2 or 3 threads of the ventilation valve.
      Fig 1: Applying Adhesive To Threads Of Ventilation Valve
      GTY161853Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Adhesive

      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    2. Install the ventilation valve.
      Fig 2: Locating Ventilation Valve Sub-Assembly
      GTY164513Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 20 N*m ( 204 kgf*cm, 15 in.*lbf) 

    3. Connect the ventilation hose.
  2. INSTALL INTAKE MANIFOLD  . Refer to INSTALLATION - Step 1
  3. INSTALL ENGINE OIL LEVEL DIPSTICK 
  4. INSTALL TRANSMISSION OIL LEVEL GAUGE SUB-ASSEMBLY (for Automatic Transaxle)  . Refer to INSTALLATION - Step 3
  5. INSTALL OIL COOLER TUBE (for Automatic Transaxle)  . Refer to INSTALLATION - Step 4
  6. INSTALL STARTER ASSEMBLY  . Refer to INSTALLATION - Step 1
  7. INSTALL INJECTOR VIBRATION INSULATOR  . Refer to INSTALLATION - Step 1
  8. INSTALL NO. 1 DELIVERY PIPE SPACER  . Refer to INSTALLATION - Step 3
  9. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY  . Refer to INSTALLATION - Step 4
  10. CONNECT FUEL TUBE SUB-ASSEMBLY  . Refer to INSTALLATION - Step 5
  11. INSTALL FUEL PIPE CLAMP  . Refer to INSTALLATION - Step 6
  12. CONNECT VACUUM HOSE  . Refer to INSTALLATION - Step 7
  13. CONNECT NO. 1 FUEL VAPOR FEED HOSE  . Refer to INSTALLATION - Step 8
  14. INSTALL HARNESS BRACKET  . Refer to INSTALLATION - Step 9
  15. INSTALL ENGINE WIRE HARNESS  . Refer to INSTALLATION - Step 10
  16. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE  . Refer to INSTALLATION - Step 2
  17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 5.4 N*m ( 55 kgf*cm, 48 ft.*lbf) 

  18. ADD ENGINE COOLANT  . Refer to REPLACEMENT - Step 2
  19. INSPECT FOR COOLANT LEAK  . Refer to ON-VEHICLE INSPECTION - Step 1
  20. INSPECT FOR FUEL LEAK 

    Refer to PRECAUTION

  21. INSTALL NO. 2 CYLINDER HEAD COVER  . Refer to INSTALLATION - Step 3
  22. INSTALL ENGINE UNDER COVER RH 

    Torque: 5.0 N*m ( 51 kgf*cm, 44 ft.*lbf) 

  23. INSTALL ENGINE UNDER COVER LH 

    Torque: 5.0 N*m ( 51 kgf*cm, 44 ft.*lbf)