LEMON Manuals: Even more car manuals for everyone
Home >> Saab >> 2010 >> 9-5 >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Basic Engine, V6 >> Adjustment Replacement >> Secondary Timing Chain Guide Replacement - Right Side >> Installation Procedure

Installation Procedure

  1. Install the secondary timing chain guide - bank 1 (1). Refer to SECONDARY TIMING CHAIN GUIDE INSTALLATION - RIGHT SIDE .
    Fig 1: Identifying Secondary Timing Chain Guide - Bank 1 And Mounting Bolt
    G09438407Courtesy of SAAB-SCANIA OF AMERICA, INC.
  2. Install the secondary timing chain tensioner - bank 1. Refer to SECONDARY TIMING CHAIN TENSIONER INSTALLATION - RIGHT SIDE .
  3. Install the engine front cover. Refer to ENGINE FRONT COVER REPLACEMENT .