LEMON Manuals: Even more car manuals for everyone
Home >> Pontiac >> 2005 >> Sunfire Standard >> Repair and Diagnosis >> Transmission >> Manual Trans >> Manual Transmission - GETRAG 5 Speed >> Repair Instructions >> Shift Control Cable Replacement >> Installation Procedure

Installation Procedure

    Fig 1: View Of Passenger Floor Pan Opening
    GM494426Courtesy of GENERAL MOTORS CORP.
  1. Feed the cable assembly through the passenger floor pan opening.
  2. Fig 2: Identifying Passenger Floor Pan Opening Grommet
    GM494624Courtesy of GENERAL MOTORS CORP.
  3. Install the grommet flush with the floor opening.
  4. Fig 3: Identifying Right Rear Floor Duct Elbow
    GM494662Courtesy of GENERAL MOTORS CORP.
  5. Install the right rear floor right side elbow duct.
  6. Position and install the passenger side carpet. Refer to Carpet Replacement - Front in Interior Trim.
  7. Fig 4: Locating Shift Control Cable Ends On Underhood Cable Bracket
    GM494730Courtesy of GENERAL MOTORS CORP.
  8. Install the cables into the underhood bracket.
  9. Fig 5: Identifying Forward Cable Locking Tabs
    GM623621Courtesy of GENERAL MOTORS CORP.
  10. Connect the shift cable to the shift actuator.
  11. Fig 6: Connecting Cables To Shifter
    GM623618Courtesy of GENERAL MOTORS CORP.
  12. Connect the cables to the shifter.
  13. Fig 7: View Of Cable Retainer
    GM623628Courtesy of GENERAL MOTORS CORP.
  14. Press down on the locking tabs.
  15. Install the console. Refer to Console Replacement - Front Floor in Instrument Panel, Gages, and Console.
  16. Install the Air Cleaner Inlet Duct.
  17. Connect the battery.