LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2008 >> 350Z 2D Convertible, Standard >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System - DTCS P0448 To P1212 >> DTC P0850 PNP Switch >> Overall Function Check >> With GST

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 109 (PNP switch signal) and ground under the following conditions.
    VOLTAGE SPECIFICATION

    Condition (Shift lever) Voltage V (Known-good data)
    P or N position (A/T) Neutral position (M/T) Approx. 0
    Except above position BATTERY VOLTAGE (11 - 14V)
  3. If NG, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 109 And Ground
    G04875311Courtesy of NISSAN MOTOR CO., U.S.A.