LEMON Manuals
: Even more car manuals for everyone
Home
>>
Mitsubishi
>>
2015
>>
Outlander ES
>>
Repair and Diagnosis
>>
Transmission
>>
Automatic Trans
>>
Continuously Variable Transaxle (CVT) Overhaul
>>
Pulley
>>
Disassembly And Assembly
>>
Post-Assembly Operation
Post-Assembly Operation
Assemble the power train.
When the reduction gear assembly and the differential assembly are replaced, adjust the shim(s), and then assemble the converter housing.
Assemble the control valve.
Assemble the ancillary parts.