Removal And Installation: Notes
Pre-removal Operation
- Engine Coolant Draining [Refer toENGINE COOLANT (CHANGE) .]
Post-installation Operation
- Transmission Fluid Supplying and Checking (Refer to AUTOMATIC TRANSMISSION FLUID ).
- Engine Coolant Supplying (Refer toENGINE COOLANT (CHANGE) ).