Front Cooling Unit: Installation
- INSTALL COOLING UNIT
- Install the cooling unit with the 4 screws and 2 nuts.
- Connect the connector.
- INSTALL ANTENNA RELAY
- Install the antenna relay with the 2 screws.
- Connect the connector.
- INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY
- INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
- Install the instrument panel safety pad sub-assembly (see INSTALLATION ).
- CONNECT LIQUID TUBE AND SUCTION TUBE
- Lubricate 4 new O-rings with compressor oil and install them to the tubes.
Compressor oil:
ND-OIL 8 or equivalent
- Connect the liquid tube, suction tubes and piping clamp.
HINT:
After connection, check the claw engagement of the piping clamp.
- Lubricate 4 new O-rings with compressor oil and install them to the tubes.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).
- CHECK SRS WARNING LIGHT
- Check the SRS warning light (see DIAGNOSIS SYSTEM ).
- CHARGE REFRIGERANT (See REPLACEMENT )
- WARM UP ENGINE (See REPLACEMENT )
- CHECK FOR LEAKAGE OF REFRIGERANT (See REPLACEMENT )