LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2004 >> Grand Cherokee Overland, AWD >> Repair and Diagnosis >> Body & Frame >> Exterior/Interior Trim >> Power Liftgate System >> Latch - Cables >> Installation

Latch - Cables: Installation

  1. Install the cable and attach it to the latch.
  2. Connect the cable to the control assembly and secure the retainer clips.
  3. Attach the support clips if equipped.
  4. Install the latch. (Refer to LATCH/GUIDE PLATE  )
  5. Adjust the cables. (Refer to ADJUSTMENTS  )