LEMON Manuals: Even more car manuals for everyone
Home >> International >> 1974 >> Scout II 4.2L Eng, 4WD, Automatic Trans >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Removal & Installation

Removal & Installation

Includes: R&I only those components necessary for the removal of the complete Engine Assembly. DOES NOT include transfer components or tune Engine.

Applies ToNoteStandard HoursWarranty HoursSkill Level
In-Line6,Automatic Trans,Gas, w/E.C.S.8.57.0C
In-Line6,Automatic Trans,Gas, w/o E.C.S.6.95.5C
Additional Procedure: ENGINE ASSEMBLY: Removal & Installation:
Where Air Cond interferes add0.60.6C
Where Air Pump interferes add0.9C
Where Power Steering interferes add0.30.3C