Module, Powertrain Control (EAB): Removal: Removal
Courtesy of CHRYSLER GROUP, LLC
- Remove the engine cover (1).
Courtesy of CHRYSLER GROUP, LLC
- Disconnect and remove the battery (Refer to REMOVAL
).
- Disconnect the Powertrain Control Module (PCM) electrical connectors (1 and 2).
Courtesy of CHRYSLER GROUP, LLC
- Disengage two starter wire harness retainers (6) from the battery tray (3).
- Disengage two engine wire harness retainers (4) from the battery tray (3).
- Disengage the engine wire harness connector (2) from the battery tray (3) and reposition the wire harness.
- Remove the nut (5) and two bolts (1).
Courtesy of CHRYSLER GROUP, LLC
- Open the two wire harness retainers (3) and reposition the wire harness.
- Remove the battery tray with the PCM (2) attached.
- Remove the four nuts (1) with ground strap (4) and remove the PCM (2) from the battery tray.