LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2013 >> Journey SE >> Repair and Diagnosis >> Electrical >> Body Electrical >> Power Distribution >> Junction Block >> Installation >> Installation

Junction Block: Installation: Installation

Fig 1: Clip, Junction Block & Electrical Connectors
GC0147764Courtesy of CHRYSLER GROUP, LLC
  1. Roll the junction block into the junction block bracket (3).
  2. Connect the electrical connectors (4).
  3. Roll the junction block (2) back into place and clip the connector (1)
  4. Install the passenger side instrument panel lower closeout. Refer to PANEL, SILENCER, LOWER, INSTALLATION .
  5. Connect the negative battery cable.