Cable, Shift Interlock: Installation: Installation
- Verify that ignition key is in ACC position.
Courtesy of CHRYSLER LLC
- Route the cable into the vehicle.
- Install the shift interlock cable (1) to the ignition module.
- Install the cable clips to the center HVAC ducts.
Courtesy of CHRYSLER LLC
- Install the lower silencing panel (3).
- Install the knee blocker. Refer to KNEEBLOCKER, INSTALLATION
.
- Route shift interlock cable towards shift mechanism.
Courtesy of CHRYSLER LLC
- Connect interlock cable housing (2) to shift mechanism.
- Adjust interlock cable. Refer to ADJUSTMENTS
for the appropriate automatic transmission.
- Install the center console. Refer to HOUSING, SHIFTER, INSTALLATION
.