LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2006 >> Sebring Base, 2D Convertible, 2.7 R >> Repair and Diagnosis >> External Pages >> Different car >> Section 40 (Starting System) >> Starting System >> Diagnosis And Testing >> Starting System >> Testing >> Control Circuit Testing

Control Circuit Testing

WARNING: This page is about a different car, the 2006 Dodge Sprinter. However, it is still accessible from the selected car via links, so may be relevant.

The starter control circuit components should be tested in the order in which they are listed, as follows:

  1. Starter Relay  - Refer to STARTER MOTOR RELAY .
  2. Starter Solenoid  - Refer to STARTER MOTOR .
  3. Ignition Switch  - Refer to Ignition Switch and  KEY/LOCK CYLINDER 
  4. Park/Neutral Position Switch  - If equipped with automatic transmission, refer to TRANSMISSION DIAGNOSTIC PROCEDURES Park/Neutral Position Switch.
  5. Wire harnesses and connections  - Refer to SYSTEM WIRING DIAGRAMS .