Pull-In Windings Test
Connect test equipment as in hold-in windings test. See HOLD-IN WINDINGS TEST above. See Fig 1 . Ground starter solenoid terminal "M". Turn switch on and adjust carbon pile load until voltage reads 10 volts. Check ammeter reading. Turn off carbon pile and open switch. See PULL-IN WINDINGS SPECIFICATIONS . If ammeter reading is not as specified, replace starter solenoid.